New analysis puts HS2’s spiralling costs over £150bn
Analysis by the Midlands Economic Forum (MEF) shows that the original construction cost of £30bn could reach as much as £106.35bn. This excludes further costs such as local infrastructure connection terminal (£43bn) and rolling stock (£2.5bn).
Mr Edwards said that Welsh taxpayers would be paying for an English railway, without receiving any benefit. The Westminster Government has already refused to give Wales any Barnett Consequentials – the normal mechanism by which a population share increase in funding for Wales is received relative to spending in England – for the project.
The MEF report also claims the power requirement costs of HS2 would be approximately one third of the output of Hinckley C, and would cost £5bn.
The overall cost of HS2, as calculated by MEF, would be £156.95bn, which equates to 7.4% of UK GDP in 2018.
Commenting, Jonathan Edwards MP said:
“HS2 has always been bad news for Wales – independent analysis shows it will mean an economic hit for our country. These latest figures, however, shows how much of an affront to the Welsh taxpayer HS2 really is.
“Welsh infrastructure is creaking. You can’t even get from the north to the south without going into a different country.
“Not only is this state of affairs symbolic of Westminster’s disdain for Wales, it is hurting our economy. Wales is stuck with a 20th century transport system, whilst helping fund the development of a multi-billion pound new transport system in England.
“We simply cannot trust another country to dictate our transport policy for any longer.”

No comments:
Post a Comment